Design Review Board Meeting - 10/23/2024
-
ROLL CALL
-
Design Review Board Hearing Minutes of May 22, 2024, June 26, 2024, July 24, 2024, August 18, 2024, and September 25, 2024 (Continued to the November 20, 2024 Design Review Board Hearing for lack of quorum for approval)
Approval of Minutes 1
-
UPDATE
-
DESIGN REVIEW BOARD/STAFF DISCUSSION
-
HEARING FROM THE AUDIENCE ON ITEMS NOT LISTED ON THE AGENDA
-
DISCUSSION AND BRIEFING AND CONSENT CALENDAR
-
AMOD24-008. APN: 300-172-19-00. Location: 931 Stratford Court. Owner/Applicant: Route 66 Investment Group. Agent: Brian Church Architecture. Zone: R2 (High Density Mixed Residential). Environmental Status: Exempt. Project Description: A request to modify previously approved plans (DRB22-009) for a new single dwelling unit to: add a new window to the west elevation of the second-story, add glazing to the garage and entry doors; add additional lighting at the south side of the property; modify the guardrails at the lightwells; and to make modifications to previously approved landscape walls.
Item 1
-
DRB20-022. APN: 300-012-17-00. Location: 1328 Camino Del Mar. Owner/Applicant: Reza Khaksari. Agent: Abbas Keshavarzi. Zone: CC (Central Commercial). Environmental Status: Exempt. Description: A request for a Design Review Permit to construct a 751 square-foot, elevated, outdoor dining deck at the west elevation of an existing commercial structure (Del Mar Seaside Grill).
Item 2
-
DRB24-007. LC24-007. APN: 300-233-04-00. Location: 629 Nob Avenue. Owner/Applicant: Bruce and Sandra Watson. Agent: Craig Friehauf, Friehauf Architects. Zone: R1-10 (Low Density Residential). Environmental Status: Exempt. Project Description: A request for Design Review and Land Conservation Permits to: construct a new 472 square-foot wood deck (mostly at-grade) located west of the residence; reduce the slope of the existing driveway by performing 30 cubic yards of cut grading and the constructing of a 4-foot-high retaining wall located on the eastern side of the driveway; modify windows/doors and exterior lighting at the building’s west elevation.
Item 4
-
ADJOURNMENT