Skip to content
Watch a Virtual Meeting Live
Watch DMTV Live
Color theme
Match my device
Light
Dark
Design Review Board Meeting
Jun 24, 2020
·
4 hours 30 minutes
·
10 agenda items
Back to Calendar
Playing this video needs JavaScript, which is turned off in this browser.
Agenda Items
0:00:00
Roll Call
0:00:40
Approval of Minutes
0:02:50
Update
0:08:50
Hearing from the Audience
0:09:10
Discussion and Briefing
0:13:36
Consent Calendar
0:19:00
DRB Policies Related to Decisions and Continuances
Design Review Board/Staff Discussion 1
1:34:00
DRB19-032. CDP19-025. LC19-016. APN: 299-185-05. Location: 355 Bellaire Street. Owners/Applicants: DMIG 355 Bellaire, LLC. Applicant’s Representative: Howard Gad (Heritage West Development Company). Zone: R1-10. Environmental Status: Categorically Exempt per Section 15303 (a) (Class 3 – New Construction or Conversion of Small Structures) of the CEQA. Staff Contact: Evan Langan, AICP, Associate Planner. Description: Demolition of an existing residential unit, and the construction of a new, single-story residential unit with attached garage, detached carport and FAR-exempt basement, in association with site grading and site improvements.
Item 2
3:22:56
DRB20-001. CDP20-001. LC20-001. APN: 301-033-16-00. Location: 537 Torrey Point Road. Owner/Applicant: Michael & Deborah Baker. Applicant’s Representative: Bob Scott, RJS Planning. Zone: CVPP (Carmel Valley Precise Plan). Overlay Zone: BSC (Bluff, Slope, Canyon), WUI (Wildland Urban Interface). Environmental Status: Exempt. Staff Contact: Afshin Atapour, Assistant Planner. Description: A request for a Design Review, Land Conservation, and Coastal Development Permit to approve a landscaping plan in conjunction with proposed grading and retaining walls at an existing residential unit. Proposed outdoor landscaping improvements would include the construction of two (2) shade structures; construction of a site wall, fence, and entry gate; construction of seating improvements; construction of a fire pit and barbeque center; construction of water features and runnel; installation of new exterior wall and path lighting for the new landscape improvements; and the planting of new vegetation.
Item 3
4:30:18
Adjournment